Evaporative Condenser Replacement & System Upgrade
heightener
Location:  
South of Boston, MA
Owner:
General Contractor:  NewMech Companies
Architect/Engineer:
Square Footage:  
Construction Cost:  $2 Million +
Year Complete: 2008
Scope of Work: NewMech was “Prime Contractor” responsible for all work at the site.

A large food distribution facility was prohibited by the local municipality from discharging condenser blow down water into their septic system.  They were faced with closing the facility or converting the system to Freon. 

After exploring several options, NewMech designed and installed a 15,600 MBH air cooled condenser field to replace the existing evaporative condensers.  This allowed the facility to keep the existing ammonia refrigeration system in place.

Because the plant will experience higher operating pressures with the air cooled condensers, the High Pressure Receiver and two thermosiphon oil coolers needed to be replaced as well.

Additionally, a new low temperature recirculator and a new high temperature recirculator were installed.  The vessels and pumps were designed match the existing loads and provide additional future capacity.