Fogerty Ice House
heightener
Location:  
Blaine MN
Owner: Private ownership LLC
General Contractor:  
Architect/Engineer: NewMech
Square Footage:  
Construction Cost:  
Year Complete: 2007
Scope of Work: • Replace evaporative condenser, condenser pump and sump tank
• Upgraded condenser to run dry above 32° F
• Increase the sump capacity to handle additional water/size of condenser
• Upsized pump to handle additional capacity required by the larger condenser