MWWTP Disinfection System Modification |
 |
| Location: |
|
|
| Owner: |
Metropolitan Waste Water Treatment Plant |
| General Contractor: |
NewMech Companies Inc |
| Architect/Engineer: |
Brown and Caldwell |
| Square Footage: |
|
| Construction Cost: |
8 Million |
| Year Complete: |
2007 |
| Scope of Work: |
Construction of a new effluent disinfection system and building:
•
NewMech was the self performing GC hired to decommission the existing
hazardous chlorine system and install the new disinfection system
within the shutdown limits for water treatment.
• decommissioning of the existing gaseous chlorine and sulfur dioxide systems
• systems were replaced with a sodium hypochlorite (for disinfection)
and sodium bisulfate (for de-chlorination) systems
• new Disinfection Building was constructed to house the liquid
chemical storage, feed pumps and related equipment
• Modifications of the existing Chlorination Operations Building were
needed to house the chlorination system for the RAS and gravity
thickener applications.
• On time completion of the project and under budget
|
|