Corval
  Industrial Construction
 

Markets Served
sidelinkspacer
> Renewable Fuels
sidelinkspacer
> Power: Coal, Gas & Wind
sidelinkspacer
> Food & Beverage
sidelinkspacer
> Petrochemical
sidelinkspacer
> Biotech
sidelinkspacer
> Chemical Processing
sidelinkspacer
> Alternative Energy
sidelinkspacer
> Water & Waste Water
sidelinkspacer
- Other




Renewable Fuels Projects
thumb
 
thumb
 
thumb
 
thumb
 
thumbGranite Falls
CLS Building
 
thumb
photo
 
 
thumb01   thumb02   thumb03      
thumbfooter
Freedom Fuels Biodiesel Facility
heightener
Location:  
Mason City, IA
Owner: Freedom Fuels
General Contractor: NewMech Companies Inc
Architect/Engineer: SSOE
Square Footage: 30 mgpy
Construction Cost: $45,000,000
Year Complete: 2007
Scope of Work: EPC contractor for the design, installation, startup and operation of a 30 million gallon bio-diesel facility:
• Responsible for all design and construction of this facility
• Construction completed in 12 months
• NewMech’s sister company Core Venture Renewable fuels is responsible for the operation of the plant as well as procurement and sale of product of feedstock




Footer