Site Construction Coordinating Contractor for the addition of 100 MW of power: • Installing a Heat Recovery Steam Generator (HRSG) on the back end of an existing GE Combustion Turbine
• the installation of a 100 MW Steam Turbine Generator
• supply and installation of all related chrome, stainless and carbon steel pipe