General Mills SP7 Freezer |
 |
| Location: |
|
|
| Owner: |
General Mills |
| General Contractor: |
NewMech Companies Inc |
| Architect/Engineer: |
NewMech Companies Inc |
| Square Footage: |
2800 |
| Construction Cost: |
$250,000 |
| Year Complete: |
2007 |
| Scope of Work: |
Line Bottom of spiral freezer with ¼” stainless steel plate and walls with 18 GA stainless steel:
• Fabrication shop and field welded
• All material was formed to slope toward the floor drain
• Material was tig welded in the field
• Two 12 hour shift for ten days in a row
• 1500 labor hours with no accidents
• All work was performed while production continued running in the plant with no interruptions
|
|