Corval
  Industrial Construction
 

Markets Served
sidelinkspacer
> Renewable Fuels
sidelinkspacer
> Power: Coal, Gas & Wind
sidelinkspacer
> Food & Beverage
sidelinkspacer
> Petrochemical
sidelinkspacer
> Biotech
sidelinkspacer
> Chemical Processing
sidelinkspacer
> Alternative Energy
sidelinkspacer
> Water & Waste Water
sidelinkspacer
- Other




Food & Beverage Projects
thumb
 
thumb
 
thumb
 
thumb
newmech
  General Mills SP7 Freezer heightener
Location:  
Chanhassen, MN
Owner: General Mills
General Contractor: NewMech Companies Inc
Architect/Engineer: NewMech Companies Inc
Square Footage: 2800
Construction Cost: $250,000
Year Complete: 2007
Scope of Work: Line Bottom of spiral freezer with ¼” stainless steel plate and walls with 18 GA stainless steel:
• Fabrication shop and field welded
• All material was formed to slope toward the floor drain
• Material was tig welded in the field
• Two 12 hour shift for ten days in a row
• 1500 labor hours with no accidents
• All work was performed while production continued running in the plant with no interruptions




Footer