 | | | Great River Energy
Boiler Feed Conveyor Replacement |  |
| Location: | |
Elk River, MN | | Owner: | Great River Energy |
| General
Contractor: | |
| Architect/Engineer: |
|
| Square
Footage: | |
| Construction
Cost: | $500,000 |
| Year
Complete: | 2006 |
| Scope of Work: | Removal and installation of
a Fuel(garbage) handling conveyor system: • All must be completed in the month of
October during the Plant Shut- Down • All conveyor section
will be removed and new installed then installed through on wall
penetration • Worked around the clock throughout October to
complete the job on time |
|