  Great River Energy Boiler Feed Conveyor Replacement heightener
Location:   Elk River, MN
Owner: Great River Energy
General Contractor:  
Architect/Engineer:  
Square Footage:  
Construction Cost: $500,000
Year Complete: 2006
Scope of Work: Removal and installation of a Fuel(garbage) handling conveyor system:
• All must be completed in the month of October during the Plant Shut- Down
• All conveyor section will be removed and new installed then installed through on wall penetration
• Worked around the clock throughout October to complete the job on time