Clock Tower |
 |
| Location: |
|
|
| Owner: |
City of Minneapolis |
| General Contractor: |
NewMech worked directly with the City |
| Architect/Engineer: |
Michaud Cooley Erickson |
| Square Footage: |
65,000 |
| Construction Cost: |
$195,000.00 |
| Year Complete: |
2006 |
| Scope of Work: |
For the buildings preservation, NewMech installed an automatic fire sprinkler system in the Clock Tower of the Old Minneapolis Courthouse. The building and the tower dated back to the 1800’s and coordinating and routing the pipe had to be completed so as not to damage any of the building’s historic features. |
|