Corval
  Fabrication
 

spacer
Markets Served

sidelinkspacer
> Renewable Fuels

sidelinkspacer
> Power & Energy
sidelinkspacer
- Health Care

sidelinkspacer
- Commercial
sidelinkspacer
- Food & Beverage




Renewable Energy Projects
thumb
 
image
  Freedom Fuels heightener
Location:  
Mason City, IO
Owner: Freedom Fuels
General Contractor:  
Architect/Engineer:  
Square Footage:  
Construction Cost: $1,500,000
Year Complete: 2006/2007
Scope of Work: Built 18 inch Pipe Bridges:
• Fabricated and assembled
• Installed above ground in the air, creating a need to be able to throw them in the air and only tie the bridges together
• Prior to shipping they were heat traced and insulated


Footer