  Parkside Professional Building  
Location:  
Minneapolis, MN
Owner: Schaefer, Richardson
General Contractor: NewMech worked directly with the Owner
Architect/Engineer: Sebesta Blomberg
Square Footage:  
Construction Cost: $1,478,000.00
Year Complete: 2006
Scope of Work: NewMech’s scope of work consisted of:
- Disconnecting the building from District Energy
- Installing a new central plant in the building’s existing 13th floor mechanical room.
New equipment consisted of:
- Five (5) new dual fuel boilers
- Three (3) new chillers
- Underground fuel oil tank and associated pumps