3M Hutchinson
|  |
| Location: | |
|
| Owner: |
3M | | General
Contractor: | Morcon Construction | | Architect/Engineer: |
PCL Construction |
| Square
Footage: | |
| Construction
Cost: |
$6,507,000.00 | | Year Complete: | 2007 |
| Scope of Work: |
New Manufacturing Plant which included:
- Extensive steam, condensate and specialty gas piping from the
existing plant through out the new facility.
- New steam station.
- Connection to nine air handling units.
- Complete HVAC and ventilation including custom sheet metal work to connect to process equipment.
- Extensive rainwater and decontamination drain systems with new domestic waters throughout.
- Plumbing connections to process areas and new bathroom groups
| |