Sandstone Prison |
|
| Location: |
|
|
| Owner: |
Federal Bureau of Prisons |
| General Contractor: |
L.S. Black |
| Architect/Engineer: |
KKE Architects – Erickson Ellison Engineers |
| Square Footage: |
10,000 sq. ft. (Powerhouse and Water Treatment Plant Only) |
| Construction Cost: |
$2,500,000.00 Mechanical |
| Year Complete: |
2006 |
| Scope of Work: |
Plumbing and heating in the Powerhouse building, including insulation.
Three packaged high pressure steam boilers and associated equipment:
- DA Tank
- Condensing Pumps
- Water Treatment Plant in same building with many pumps, filters,blowers and control valves. |
|